Â鶹´«Ã½Porn

safb-5008-squad-ops_exterior_procore

SAFB Repair Squadron Operations Building 5008

ÌýLocation: ÌýScott AFB, ILÌý Ìý |Ìý Ìý Owner: National Guard Bureau, USPFO for Illinois Ìý |Ìý Ìý Architect: Bailey Edward

The , 182 MSG/MSC, chose Â鶹´«Ã½Porn and its small business partner for interior and exterior upgrades to Squadron Operations Building 5008 located at Scott Air Force Base.

This complete and overall facility upgrade included:

  • Repairing structural elements required by seismic classification rezoning
  • Installing new blast-proof windows required by Anti-Terrorism Force Protection standards
  • Repairing the standing seam roof and replacing the thermoplastic membrane on the existing flat roof
  • Replacing the loading dock ramp and associated safety measures
  • Adjusting the existing floor plan layout to better utilize the facility
  • Updating interior finishes of the walls, ceilings, and flooring
  • Upgrading the current mechanical, electrical, plumbing, fire detection/suppression, and communication systems for better energy-efficiency

To accelerate construction, the government agency vacated the facility and utilized temporary office facilities throughout the project.

This project achieved LEED Silver Certification.

UNIQUE FEATURES

Roof/Structural Repairs

Upgraded Building Systems

Interior Finish Upgrades

LEED Silver Certification

SIMILAR EXPERIENCE

SIH Cancer Center | Â鶹´«Ã½Porn